I-20 in both directions: Road construction, roadway reduced to one lane, because of road maintenance activities.
I-20 in both directions: Road construction.
Between Exit 44: US 371 (Minden) and Exit 55: US 80 (2 miles east of the Dubberly area). Road construction work is in progress. The roadway is reduced to one lane because of road maintenance activities. Until March 1, 2018 at about 11:59PM CDT.

Web Comment: Motorists are advised that 7 miles of I-20, through Minden, will be restricted to two-lanes separated by concrete barrier. The two-lane traffic will be located between exits 47 (LA 371 South) and exit 55 (US 80, just across the Bienville Parish line). This lane restriction will begin Monday, Oct. 31. The lane closures are expected to last until March 1, 2018. The closure is necessary to remove and replace 11 inches of asphaltic surfacing. This work will be performed WEATHER PERMITTING. Permit/Detour section: 12’ width restriction is crucial. It will be in effect for the entire duration of this two-way traffic.
I-20 in both directions: Road construction.
Map of I-20 in both directions: Road construction.
Zoom In
Zoom Out
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash

Construction Construction Warning Warning Info Info
Moderate Traffic Waze: Moderate Traffic Heavy Traffic Waze: Heavy/Standstill Traffic Weather Waze: Weather
Heavy Traffic Waze: Construction Hazard Waze: Hazard Accident Waze: Accident

Closure Waze: Closure Flooding Flooding/Ice