LA 473 in both directions: Paving operations, roadway reduced to one lane.
LA 473 in both directions: Paving operations.
Between LA 191 (7 miles south of the Hornbeck area) and LA 392 (near Hornbeck). The road is being repaved. The roadway is reduced to one lane. Width limit 12'0". Until December 31, 2017 at about 11:59PM CDT.

Web Comment: The Louisiana Department of Transportation and Development (DOTD) announces that, weather permitting, work will begin on the LA 473 Pavement Patching and Overlay Project on Monday, September 25, 2017 and will continue for approximately (3) three months. This pavement patching and overlay project is located on LA 473 from its junction with LA 191 to its junction with LA 392. This 8.262 mile overlay project will receive grading, pavement patching, milling asphalt concrete, asphalt concrete overlay, and related work. The project was awarded to the low bidder, Prairie Contractors Inc in the amount of $1,390,386.13. Permit/Detour Section The contractor will begin pavement patching on Monday, September, 2017 and the roadway will be open to all local and through traffic with no restrictions for passenger vehicles and a 12’ wide lane width restriction for all oversize vehicles. The roadway will be reduced to one lane during construction operations. Safety Reminder DOTD appreciates your patience and reminds you to please drive with caution and be on the lookout for work crews and their equipment.
LA 473 in both directions: Paving operations.
Map of LA 473 in both directions: Paving operations.
Zoom In
Zoom Out
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash

Construction Construction Warning Warning Info Info
Moderate Traffic Waze: Moderate Traffic Heavy Traffic Waze: Heavy/Standstill Traffic Weather Waze: Weather
Heavy Traffic Waze: Construction Hazard Waze: Hazard Accident Waze: Accident

Closure Waze: Closure Flooding Flooding/Ice