LA 21 in both directions: Road construction, alternating lane closures.
LA 21 in both directions: Road construction.
Between LA 41 and LA 16 (near Sun). Road construction work is in progress. There are alternating lane closures. Until September 4, 2017 at about 6:00AM CDT.

Web Comment: There will be alternating closures of the inside (left) lane and outside (right) lane of the northbound and southbound lanes on LA 21 between LA 41 and LA 16, beginning Monday morning, August 7, 2017, at 6:00 AM through Monday morning, September 4, 2017, at 6:00 AM while crews place asphalt on the shoulder and embankment work, weather permitting. One lane in each direction will be open at all times. Permit/Detour Section By law, oversize loads are not allowed to travel at night. Emergency vehicles will have access. Safety Reminder DOTD appreciates your patience and reminds you to please drive with caution and be on the lookout for work crews and their equipment.
LA 21 in both directions: Road construction.
Map of LA 21 in both directions: Road construction.
Zoom In
Zoom Out
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash

Construction Construction Warning Warning Info Info
Moderate Traffic Waze: Moderate Traffic Heavy Traffic Waze: Heavy/Standstill Traffic Weather Waze: Weather
Heavy Traffic Waze: Construction Hazard Waze: Hazard Accident Waze: Accident

Closure Waze: Closure Flooding Flooding/Ice