LA 105 in both directions: Road construction, intermittent lane closure.
LA 105 in both directions: Road construction.
Between Woodside Plantation Road and LA 1183 (1 to 6 miles south of the Simmesport area). Road construction work is in progress. A lane is closed intermittently.

Web Comment: LA 105: St. Landry Parish Line to LA 1183 Avoyelles Parish S.P. No. H.012107 Control Section No. 144-04 The Louisiana Department of Transportation and Development (DOTD), advises the public that, weather permitting, on Thursday, April 5, 2018 road construction work will begin on LA 105 from the St. Landry Parish Line to the intersection of LA 1183. This 5.9 miles long road base rehabilitation construction project will consist of in-place cement treated base course, superpave asphaltic concrete pavement, and related work. This contract was awarded to the low bidder, Prairie Contractors Inc. in the amount of $2,204,507.93. Permit/Detour Section No wide loads will be allowed beginning April 5, 2018. The roadway will be open to traffic at all times; however, there will be lane closures. Unpaved roadway conditions will exist during base course construction. Safety Reminder DOTD appreciates your patience and reminds you to please drive with caution through the construction site and be on the lookout for work crews and their equipment.
LA 105 in both directions: Road construction.
Map of LA 105 in both directions: Road construction.
Zoom In
Zoom Out
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash

Construction Construction Warning Warning Info Info
Moderate Traffic Waze: Moderate Traffic Heavy Traffic Waze: Heavy/Standstill Traffic Weather Waze: Weather
Heavy Traffic Waze: Construction Hazard Waze: Hazard Accident Waze: Accident

Closure Waze: Closure Flooding Flooding/Ice