LA 38 in both directions: Road construction, alternating lane closures, intermittent lane closure.
LA 38 in both directions: Road construction.
Between LA 1054 and South Wesley Alford Road (1 to 7 miles east of the Kentwood area). Road construction work is in progress. There are alternating lane closures. A lane is closed intermittently. Until August 13, 2017 at about 7:00PM CDT.

Web Comment: Intermittent and alternating lane closures on LA 38 from Jct. LA 1054 to the Washington Parish Line will recommence Monday, July 10, 2017 through Sunday, August 13, 2017 daily from 7 a.m. to 7 p.m. (weather permitting) while crews perform Asphalt Milling and Soil Cement operations. Traffic will be maintained through the work zone at all times. No oversized loads greater than 10’ wide will be allowed through the construction zone during work hours. This notice will be updated. DOTD appreciates your patience and reminds you to please drive with caution through the work site and be on the lookout for work crews and equipment.
LA 38 in both directions: Road construction.
Map of LA 38 in both directions: Road construction.
Zoom In
Zoom Out
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash

Construction Construction Warning Warning Info Info
Moderate Traffic Waze: Moderate Traffic Heavy Traffic Waze: Heavy/Standstill Traffic Weather Waze: Weather
Heavy Traffic Waze: Construction Hazard Waze: Hazard Accident Waze: Accident

Closure Waze: Closure Flooding Flooding/Ice