I-220 in both directions: Road construction.
I-220 in both directions: Road construction.
Between Exit 5: LA 173; Shreveport Blanchard Highway and Exit 11: LA 3; Benton Road (near Shreveport). Road construction work is in progress. The roadway is reduced to one lane due to a planned roadwork project.

Web Comment: Motorists are advised that on Wednesday, May 27, 2015 at 8:00 pm all traffic on I-220 in both the east and west bound direction between LA 1 and LA 173 will be placed on the east bound lanes of I-220 in a two- way traffic configuration. The two-way traffic pattern is required to facilitate the reconstruction of I-220 at the future I-220/I-49 North Interchange. The two way traffic pattern in the east bound lanes of I-220 will have a duration of approximately (6) six months. Alternate Route: N/A Restriction/Permits: ALL loads are limited to the following restrictions: Maximum width of 11 feet Maximum length of 140 feet Safety Reminder: DOTD appreciates your patience and reminds you to please drive with caution through the construction site and be on the lookout for work crews and their equipment.