I-12 in both directions: Road construction, intermittent lane closure.
I-12 in both directions: Road construction.
Between Exit 19: South Satsuma Road (near Livingston) and Exit 32: LA 43 (1 mile west of the Albany area). Road construction work is in progress. A lane is closed intermittently. From 8:00PM CST to 6:00AM CST daily.

Web Comment: I-12, from 3.0 miles west of LA 441 to LA 441, will be under construction beginning Wednesday, March 2, 2016. This work is expected to be completed in September 2017. Please be prepared for intermittent delays and possible nightly single lane closures (Eastbound and Westbound) between the hours of 8:00 pm to 6:00 am (Sunday through Saturday). At least one lane in each direction will remain open at all times. The purpose of this project is to widen the existing bridges over the Tickfaw River, widen 2,800 feet of roadway on each end of the bridges, install a median barrier wall on the widened roadway, and to replace the existing bridge approaches. Motorists may take LA 63 to US 190 to LA 441 as an alternate route to avoid nightly lane closures during construction. DOTD appreciates your patience and reminds you to please drive with caution through the construction site and be on the lookout for work crews and their equipment.
I-12 in both directions: Road construction.
Map of I-12 in both directions: Road construction.
Zoom In
Zoom Out
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash

Construction Construction Warning Warning Info Info
Moderate Traffic Waze: Moderate Traffic Heavy Traffic Waze: Heavy/Standstill Traffic Weather Waze: Weather
Heavy Traffic Waze: Construction Hazard Waze: Hazard Accident Waze: Accident

Closure Waze: Closure Flooding Flooding/Ice