LA 25 in both directions: Road construction, alternating lane closures.
LA 25 in both directions: Road construction.
Between Mockingbird Hill Road (2 miles north of the Folsom area) and LA 16 (near Franklinton). Road construction work is in progress. There are alternating lane closures. Until June 30, 2018 at about 11:59PM CDT.

Web Comment: There will be alternating lane closures of the northbound and southbound lanes on LA 25 between the St. Tammany Parish Line to LA 16 from Sunday, May 13, 2018, through Saturday, June 30, 2018, while crews replace asphalt, guardrail, mailboxes, shoulder work, seeding and permanent striping, weather permitting. One lane will be open at all times. Permit/Detour Section By law, oversize loads are not allowed to travel at night. Emergency vehicles will have access. To avoid delays, motorists traveling north on LA 25 may take LA 450 (approximately 3 miles north of Folsom), north on LA 450 to LA 16, east on LA 16 to LA 25. Motorists traveling south on LA 25 may take LA 16 (approximately 2.5 miles south of Franklinton), west on LA 16 to LA 450, south on LA 450 to LA 25. Safety Reminder DOTD appreciates your patience and reminds you to please drive with caution and be on the lookout for work crews and their equipment.
LA 25 in both directions: Road construction.
Map of LA 25 in both directions: Road construction.
Zoom In
Zoom Out
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash

Construction Construction Warning Warning Info Info
Moderate Traffic Waze: Moderate Traffic Heavy Traffic Waze: Heavy/Standstill Traffic Weather Waze: Weather
Heavy Traffic Waze: Construction Hazard Waze: Hazard Accident Waze: Accident

Closure Waze: Closure Flooding Flooding/Ice